Quantifies total cut and fill volumes across the site based on comparison of existing and proposed surfaces. This is the core earthwork quantity deliverable, used for bidding, budgeting, and confirming material balance (import/export needs) before construction begins.
Full materials takeoff covering civil and sitework scopes — including aggregate base, subgrade materials, utility bedding and backfill (storm, sanitary, water), pipe and structure materials (RCP, HDPE, PVC, manholes, catch basins), pavement materials (asphalt, concrete, base course), curb and gutter, sidewalk and flatwork concrete, retaining wall materials, geotextile fabric and erosion control materials, striping and signage, and other bulk materials required for the project. Supports accurate procurement planning and cost estimation across civil and sitework construction.
- All Required AGTEK Reports:
Depth Bracket Summary, Trench Volume Report, Building Excavation Footer Report, Structure Measures Summary, Material Summary Report, Structure Measures Report, and Depth Bracket Report.
- 3D Earthwork Model (Heat Map):
 Complete 3D model (heat map) to support accurate earthwork takeoff, validation and clear communication of grading scope. This deliverable converts the project’s civil plans and survey data into a true 3D representation of the site, allowing stakeholders to visually understand grading intent and verify quantities with confidence.
- Marked-up Color Coded Drawings:
Annotated drawings highlighting earthwork, civil work, and full sitework areas. These include cut/fill zones, grading, utility placements, and other key site elements, providing a clear visual reference to support the takeoff reports.
A full utility 3d model developed in AGTEK Grade Work 4D representing underground services in true 3D space (horizontal alignment and vertical profile). The model is built from plan/CAD linework and available utility elevations (invert/centerline/rim).
- Utility Conflict Identification (for Agtek users):
A dedicated Utility Conflict Identification workflow is included to detect and document interferences (clashes/conflicts) between utilities, trenches, structures, and/or controlling surfaces.
For advanced verification and adjustments in AGTEK.