Sitework is one of the first and most important steps in any construction project. Before a building, road, or structure can be formed, the land must be prepared to support it. Sitework includes everything that happens on the ground before the actual building begins, such as clearing the land, grading, installing utilities, and preparing foundations. Because these tasks affect the safety, cost, and timeline of the entire project, accurate sitework estimating is essential.
Sitework estimating is one of the most important steps in planning a construction project. Before any building, road, or commercial structure goes up, the land must be prepared. Sitework is considered part of Division 31 (Earthwork) in the construction industry. Good estimating helps project owners, contractors, and engineers know the true cost, time, labor, and materials needed for preparing the site.
Sitework includes all activities done before the actual building starts. It focuses on getting the land ready by clearing, grading, shaping, and improving the site.
Common examples of sitework include:
Removing trees and debris
Excavate and fill dirt
Installing underground utilities
Preparing roads, parking areas, and access points
Soil testing and stabilization
In the U.S., sitework is a major cost component and can represent 10%–25% of the total project budget, depending on soil type, climate, and terrain.
Clearing and grubbing is the first step on any jobsite.
What it includes:
Removing trees, bushes, grass, and overgrown vegetation
Cutting and pulling out stumps and roots so they don’t affect foundations
Clearing trash, old structures, rocks, and any surface debris
Stripping topsoil (organic soil that cannot support structures)
Why it matters:
A clean site ensures machines can move safely and prevents roots or soft soil from causing cracks or uneven settling later.
This stage shapes the land to match the construction plans.
Excavation includes:
Digging soil for basements, footings, utility trenches, and foundations
Removing unsuitable soil (wet, loose, or unstable)
Grading includes:
Leveling the site to create smooth areas for buildings, roads, and parking lots
Adjusting slopes to control water flow away from structures
Why it matters:
Proper excavation and grading prevent flooding, foundation settling, and drainage problems.
Before any structure is built, the soil must be checked to see if it can safely support the load.
Soil testing includes:
Checking soil type (clay, sand, silt, rock)
Measuring moisture content
Determining compaction strength
Finding water table levels
Stabilization methods include:
Adding lime, cement, or gravel to strengthen weak soil
Using geotextile fabric to increase stability
Removing and replacing poor soil
Why it matters:
Weak soil can cause cracks, uneven floors, and long-term structural issues. Testing reduces risk and prevents costly repairs.
This step installs all essential services that must go underground before construction begins.
Utilities include:
Water supply lines
Sanitary sewer and storm sewer lines
Electrical conduits
Gas lines
Communication lines (internet, fiber, phone)
Typical work involves:
Digging trenches to required depth
Laying pipes and conduits
Proper bedding with gravel
Leak testing and inspection
Backfilling trenches
Why it matters:
Installing utilities early keeps the project efficient and prevents the need to dig around completed structures later.
This includes creating safe access routes for vehicles and future occupants.
What it includes:
Removing soft soil and preparing the subgrade
Installing gravel base layers
Compacting the ground to achieve proper strength
Creating slopes for drainage
Preparing areas for asphalt or concrete paving
Why it matters:
Strong and well-prepared access roads prevent damage to delivery trucks during construction and ensure long-term durability of parking and driveway areas.
Erosion control prevents soil from washing away during rain, storms, or construction activities.
Methods include:
Installing silt fences around the site
Using straw wattles, erosion blankets, and temporary barriers
Controlling stormwater runoff
Protecting nearby streets and waterways from sediment
Why it matters:
U.S. environmental regulations require erosion control to protect public property and natural water systems.
After trenches, foundations, or underground utilities are completed, they must be properly filled and compacted.
Backfilling includes:
Placing soil or gravel back into excavated areas
Compaction includes:
Using rollers, rammers, or compactors to remove air gaps
Creating strong, stable ground that resists settlement
Why it matters:
Proper compaction prevents sinking, cracking, and uneven surfaces around foundations and pavement.
The final step before structural construction begins.
What it includes:
Fine grading the foundation area
Placing gravel base layers for drainage
Setting forms for concrete footings and slabs
Ensuring proper elevation and alignment
Preparing trenches for deep foundations or piers
Why it matters:
A well-prepared foundation area reduces the risk of moisture problems, uneven settling, and structural defects.
Unclassified sitework means all types of earth—soil, rock, gravel, clay—are treated the same in the estimate.
The contractor must move whatever material exists on site, without separate payment for rock excavation or difficult soil.
This type of estimate is common when:
Soil reports are not complete
The owner wants simple bidding
The contractor accepts higher risk
Unclassified sitework typically leads to higher bids because contractors must prepare for worst-case conditions.
Â
| Type | Description | Contractor Risk Level |
|---|---|---|
| Classified | Soil types priced separately | Low |
| Unclassified | All soil treated the same | High |
Sitework estimating is the process of calculating the cost and quantities needed for all land-preparation work. Estimators analyze the site’s condition, soil type, elevations, utilities, and geographic factors to prepare an accurate budget.
Estimating helps project owners avoid:
Unexpected expenses
Delays caused by poor planning
Design changes due to incorrect assumptions
We offer accurate and affordable sitework estimating services across the United States.
Sitework estimating is crucial because it affects the entire construction timeline. If the estimate is wrong, the whole project may face cost overruns.
Key reasons why it is important:
1. Prevents Cost Surprises
Soil issues, water tables, rock layers, and existing utilities can increase costs. Accurate estimates help avoid hidden expenses.
2. Ensures Proper Project Scheduling
Bad site estimates delay foundation work and structural construction.
3. Helps Contractors Bid Correctly
Competitive but realistic bids come from accurate takeoffs and calculations.
4. Improves Safety
Understanding site conditions reduces risks during excavation and utility work.
5. Supports Regulatory Compliance
U.S. cities require detailed plans before approving permits.
| Sitework Category | Average % of Budget |
|---|---|
| Clearing & Grubbing | 5–10% |
| Excavation & Grading | 25–40% |
| Utilities Installation | 20–30% |
| Road Base & Paving Prep | 10–20% |
| Erosion Control | 5–8% |
| Soil Testing & Stabilization | 5–10% |
Sitework estimating is completed in multiple phases. Below is a simple breakdown of how professionals perform it in the U.S. construction industry.
Phase 1: Site Assessment
Review location, terrain, zoning rules
Study aerial maps and topographic surveys
Check environmental restrictions
Phase 2: Soil and Geotechnical Analysis
Soil boring reports
Moisture and compaction tests
Rock vs. soft soil identification
Phase 3: Quantity Takeoff
Estimators calculate:
Cubic yards of excavation
Fill material needed
Trench lengths
Utility depths
Road base and gravel quantities
Phase 4: Costing
Costs are assigned for:
Labor
Equipment (dozers, graders, excavators, rollers)
Materials
Fuel
Trucking
Subcontractors
Phase 5: Risk and Contingency Planning
Estimators add allowances for:
Bad weather
Unstable soil
Water table issues
Underground obstruction surprises
Phase 6: Final Estimate and Proposal
A complete report is created for owners, including:
Work schedule
Cost summary
Site plan
Utility layout
Permits required
We offer sample sitework estimates to help you understand costs, quantities, and project requirements.
The scope of work defines everything the sitework contractor must do. In the U.S., it often includes:
Pre-construction surveys
Traffic control and temporary access
Clearing, excavation, grading
Trench work for utilities
Import or export of fill material
Foundation preparations
Stormwater management
Final site cleanup
A clear scope avoids disputes between owners and contractors.
Sitework estimating is essential for many people in the construction industry:
General Contractors
They must prepare bids for commercial, residential, or industrial projects.
Developers
They need accurate budgets before buying land.
Civil Engineers
They use estimates to plan grading, utilities, and drainage systems.
Architects
They coordinate building design according to site conditions.
Municipal Governments
Public projects like roads, parks, and utilities rely on accurate sitework costs.
Home Builders
New housing subdivisions require full site preparation.
Utility Contractors
They depend on accurate trench and excavation estimates.
For a medium-sized project, a detailed estimate can take anywhere from a few days to two weeks, depending on the site’s complexity.
Yes, but it is more challenging and expensive. Frozen ground is hard to excavate, and special measures are needed for pouring concrete, which can increase costs.
This is usually the responsibility of the general contractor or the sitework contractor, but it must be clearly defined in the contract. They will get permits from the local city or county building department.
Work must stop immediately. Environmental agencies must be notified. The cost for cleanup (remediation) is typically not included in the original estimate and becomes a large, separate project.
For most professional contractors, yes. Software greatly increases speed and accuracy in measurements and calculations, reducing costly errors.
For long-term projects, estimators may add an escalation clause to their bid. This is a formula that allows the final price to adjust if material costs go up between the bid date and when the materials are bought.
It is highly recommended because soil reports reduce risk and improve cost accuracy.